Installation and Commissioning of Screw Chillers

Apr 19, 2026

Leave a message

The installation and commissioning of screw chiller units must adhere to a systematic process to ensure their long-term, stable, and efficient operation. Prior to installation, thorough planning and preparation regarding the site, piping, and electrical systems are required. The commissioning phase encompasses system inspections, pre-treatment procedures, startup verification, and load testing. Upon completion of commissioning, a routine inspection and periodic maintenance regimen must be established.


The installation site should be a dedicated equipment room characterized by good ventilation, an ambient temperature not exceeding 45°C, the absence of corrosive gases, and minimal dust accumulation; furthermore, sufficient clearance must be reserved for maintenance access and tube extraction. The foundation must consist of a concrete or steel structure capable of supporting the unit's operating weight, and its levelness must meet specified requirements. The chilled water and cooling water piping systems should be configured independently, utilizing either welded seamless steel pipes or flanged connections. Key components include a Y-strainer installed at the water pump inlet, a paddle-type flow switch installed vertically on the water outlet pipe, and a safety valve mounted directly on the condenser body. In instances where water quality is poor, water softening equipment must be installed. The main power supply should utilize a three-phase, five-wire configuration, with voltage fluctuations limited to ±10% and a three-phase voltage imbalance not exceeding 2%; the grounding resistance must be ≤4Ω. For control circuitry, the use of shielded cables with single-point grounding is recommended.


Prior to commissioning, a comprehensive inspection must be conducted covering the unit's installation location, foundation condition, water system flow direction and cleanliness, pipe insulation integrity, water pump rotation direction, water pressure stability, compatibility with terminal air-conditioning loads, and the specifications of electrical wiring and protective device settings. System pre-treatment procedures include evacuating the system to -0.1 MPa using a vacuum pump and maintaining this vacuum for 24 hours; conducting a pressure-holding test by charging the system with nitrogen to 1.5 times the working pressure; and flushing the piping system with softened water until the discharge water runs clear. Before starting the unit, power must be supplied at least eight hours in advance to preheat the compressor's lubricating oil until the oil temperature reaches or exceeds 30°C. Subsequently, the chilled water pump and cooling water pump are started in sequence; once the flow switch signals are verified as normal, the chiller unit is started, and critical operating parameters-such as suction pressure, discharge temperature, and oil pressure differential-are verified. Finally, the unit must undergo a full-load operational test to monitor and confirm the stability of the chilled water outlet temperature. Routine maintenance requires recording operating parameters-such as evaporation pressure, condensing pressure, oil temperature, and current-during every shift, as well as checking for any abnormal vibrations or leaks. Additionally, the water filter should be cleaned monthly, and the quality of the lubricating oil should be tested quarterly. Comprehensive annual maintenance should focus on inspecting the compressor rotors for wear, cleaning the oil circulation system, and testing the insulation performance of electrical components and the purity of the refrigerant; it is recommended that these tasks be performed by a professional team.

 

info-800-800

Send Inquiry